Transportation Energy Filling Equipment Manufacturer-Windbell

  • sales@windbelltek.com
  • 0371-6030 1609
  • 简体中文
    简体中文
  • English
    English
  • Home
  • Solutions
    • Petrol Station ATG

      Petrol Station ATG

      Petrol Station ATG
    • Fuel Depot ATG

      Fuel Depot ATG

      Fuel Depot ATG
    • Skid-mounted Site ATG

      Skid-mounted Site ATG

      Skid-mounted Site ATG
    • Tank Truck ATG

      Tank Truck ATG

      Tank Truck ATG
    • Chemical Plant ATG

      Chemical Plant ATG

      Chemical Plant ATG
    • Leak Detection System

      Leak Detection System

      Leak Detection System
  • Products
    • Automatic Tank Gauge Probes

      Automatic Tank Gauge Probes

      Automatic Tank Gauge Probes
    • Automatic Tank Gauge Consoles

      Automatic Tank Gauge Consoles

      Automatic Tank Gauge Consoles
    • Leak Detection System

      Leak Detection System

      Leak Detection System
    • Tank Monitoring Software

      Tank Monitoring Software

      Tank Monitoring Software
    • Tank Area Security Equipment

      Tank Area Security Equipment

      Tank Area Security Equipment
    • Tank Gauging Optional Device

      Tank Gauging Optional Device

      Tank Gauging Optional Device
  • Support
    • Service

      Service

      Service
    • Download

      Download

      Download
    • FAQ

      FAQ

      FAQ
    • Video

      Video

      Video
  • News
    • Company News

      Company News

      Company News
    • Industry News

      Industry News

      Industry News
  • About
    • Windbell Profile

      Windbell Profile

      Windbell Profile
    • Windbell Culture

      Windbell Culture

      Windbell Culture
    • Windbell Honors

      Windbell Honors

      Windbell Honors
    • Business license

      Business license

      Business license
  • Distributor
    • Become A Dealer

      Become A Dealer

      Become A Dealer
  • Contacts

Position:Home /  Support  / Service  /  Site Prepration

Support LIST

Service

  • Pre-sale Service
  • After-sale Service
  • Warranty
  • Site Prepration
  • ATGs Installation
  • ATGs Configuration
  • Probe Selection

Download

  • Product Brochures
  • User Manuals
  • Product Instructions

FAQ

Video

HOT PRODUCT

Anti-overfill Valve
Anti-overfill Valve
Tank Level Display
Tank Level Display
Submersible Pump Console
Submersible Pump Console
4G GPRS Module
4G GPRS Module

Contact us

    • Tel:+86-371-60301609
    • Fax:+86-371-60301612
    • E-mail:emily@windbelltek.com
    • Skype:ling66ling
    • Add : No.9, Changchun Rd, High-tech Development Zone, Zhengzhou, China 450001
< >
  • Site Prepration

Site Prepration

The installation quality of Automatic Tank Gauges system and its accessories have a close bearing on safety, service quality, measuring accuracy and lifetime.
In order to operate safely, please conform to manufacturer requirements. If out of accord with local regulation, please install and operate according to local regulation.

We're here to help:
Easy ways to get the answers you need.

  • Chat Now
  • SEND EMAIL
  • Storage tank
  • Riser pipe
  • Man-well
  • Communication cable
  • Office requirements

Storage tank

Please keep the distance between tank level probe, delivery pipe and suction pipe more than 1 meter. Otherwise, the oil flow will influence on the probe performance, even bend and damage the probe.

During the installation, it is important to adjust outlet direction of delivery pipe to opposite to the tank level gauge probe. 

Riser pipe

Riser pipe must be welded vertical (vertical for horizontal not for manhole cover), insert into manhole cover but not more than 100mm. Internal wall of riser pipe must be smooth and no welding slag.  

Riser pipe

Open a cable hole on the center of blind flange, fix G1/2 screw for cable pass and seal. Please see the picture at below.

Windbell tank gauge

Man-well

 ●Man-well opening should be larger than 800x800mm, for convenient to construct.

 ●Man-well opening must have a wall higher than 300mm, to avoid outside water penetrating into . Man-well also has cover above. 。

 ●Man-well opening must have a wall higher than 300mm, to avoid outside water penetrating into . Man-well also has cover above.

 ●There must be asbestos pad between riser pipe flange and blind flange, and jointing with sheet copper.

 ●Earth sheet iron must be reliable connected to the earth system of underground tanks, earth resistance should less than 1 Ω.

 ●Earth wire should larger than 6 m㎡, and connect to earth sheet iron reliably.

Site Prepration

Communication cable

All communication cables must go through protection steel pipe.

●When lying, protection steel pipe must be put under ground at least 300mm depth. Spacing distance between pipes must be at least 200mm.

●When lying, protection steel pipe must be put under ground at least 300mm depth. Spacing distance between pipes must be at least 200mm.

●Each cable of probe must be put in separate pipe.

●The cable from smart console to probe must be complete one, shouldn’t have any joint.

●For safety, we recommend use RVVP4×0.5 (or larger) shield cable and must accord with the requirement of capacitance per foot not more than 100pF, length of cable less than 300m. Shielding layer of cable from probe must be coupled with PE port of console, the shielding layer of cable in explosion proof junction box should be wrap up well by black tape,

●Protection steel pipe should be coupled with the earth system of gas station.

●The end of pipe which inside control room must be injected into silicon rubber, to ensure reliable sealing and avoid vapor going into room.

Office requirements

●AC220V/50Hz ±10%

●Power supply should be same phase and same position ( Zero wire left and live wire right, that is means face to socket, the left is zero wire, the right is live wire.

●Make sure reliable earth, and this earth should be same as office ground and tank area.

●It is forbidden that  connects to zero wire to  earth wire, do not mixed connection of zero wire and earth wire.

●There should have earth device or grounding sheet iron near console.

●This grounding device or grounding sheet iron should be truly connects to earth and keep equipotential with tank area. 

Safety warning:

To ensure normal work of gas station safety system, the anti-lightning system of gas station should be able to protect the whole ATGs system, and reserve earth port for ATGs system.

ATG system share the same earth connection of tank area.

The  communication cable tube of probe should not share the same tube with other cables.

Site Prepration

Related downloads

Fllow Us:

  • Youtube

  • Facebook

  • Twitter

  • Google+

  • Linkedin

CONTACT US

  • Tel:0371-6030 1609
  • Fax : +86-371-60301612
  • E-mail:sales@windbelltek.com

Add:No.9, Changchun Rd, High-tech Development Zone, Zhengzhou, China 450001

Our product

  • Automatic Tank Gauge Probes
  • Automatic Tank Gauge Consoles
  • Leak Detection System
  • Tank Monitoring Software
  • Tank Area Security Equipment
  • Tank Gauging Optional Device

GET IN TOUCH

 Solutions  |  Products  |  Support  |  News  |  About  |  Distributor  |  Contacts

Copyright © 2014-2015 ZHENGZHOU WINDBELL MEASUREMENT AND CONTROL TECHNOLOGY CO., LTD.All rights reserved. Powered by MetInfo 公司营业执照信息公示

- - Quick Links - -
PETROL PLAZA
PETROLEUM EQUIPMENT INSTITUTE
China Sinopec
CNPC
0371-6030 1609
8613783500071