Transportation Energy Filling Equipment Manufacturer-Windbell

  • sales@windbelltek.com
  • 0371-6030 1609
  • 简体中文
    简体中文
  • English
    English
  • Home
  • Solutions
    • Petrol Station ATG

      Petrol Station ATG

      Petrol Station ATG
    • Fuel Depot ATG

      Fuel Depot ATG

      Fuel Depot ATG
    • Skid-mounted Site ATG

      Skid-mounted Site ATG

      Skid-mounted Site ATG
    • Tank Truck ATG

      Tank Truck ATG

      Tank Truck ATG
    • Chemical Plant ATG

      Chemical Plant ATG

      Chemical Plant ATG
    • Leak Detection System

      Leak Detection System

      Leak Detection System
  • Products
    • Automatic Tank Gauge Probes

      Automatic Tank Gauge Probes

      Automatic Tank Gauge Probes
    • Automatic Tank Gauge Consoles

      Automatic Tank Gauge Consoles

      Automatic Tank Gauge Consoles
    • Leak Detection System

      Leak Detection System

      Leak Detection System
    • Tank Monitoring Software

      Tank Monitoring Software

      Tank Monitoring Software
    • Tank Area Security Equipment

      Tank Area Security Equipment

      Tank Area Security Equipment
    • Tank Gauging Optional Device

      Tank Gauging Optional Device

      Tank Gauging Optional Device
  • Support
    • Service

      Service

      Service
    • Download

      Download

      Download
    • FAQ

      FAQ

      FAQ
    • Video

      Video

      Video
  • News
    • Company News

      Company News

      Company News
    • Industry News

      Industry News

      Industry News
  • About
    • Windbell Profile

      Windbell Profile

      Windbell Profile
    • Windbell Culture

      Windbell Culture

      Windbell Culture
    • Windbell Honors

      Windbell Honors

      Windbell Honors
    • Business license

      Business license

      Business license
  • Distributor
    • Become A Dealer

      Become A Dealer

      Become A Dealer
  • Contacts

Position:Home /  Support  / Service  /  ATGs Installation

Support LIST

Service

  • Pre-sale Service
  • After-sale Service
  • Warranty
  • Site Prepration
  • ATGs Installation
  • ATGs Configuration
  • Probe Selection

Download

  • Product Brochures
  • User Manuals
  • Product Instructions

FAQ

Video

HOT PRODUCT

Anti-overfill Valve
Anti-overfill Valve
Tank Level Display
Tank Level Display
Submersible Pump Console
Submersible Pump Console
4G GPRS Module
4G GPRS Module

Contact us

    • Tel:+86-371-60301609
    • Fax:+86-371-60301612
    • E-mail:emily@windbelltek.com
    • Skype:ling66ling
    • Add : No.9, Changchun Rd, High-tech Development Zone, Zhengzhou, China 450001
< >

ATGs Installation

The installation quality of ATG system and its accessories have a close bearing on safety, service quality, measuring accuracy and lifetime. In order to operate safely, please comply with this notice. If it is out of accord with local regulation, please install and operate according to local regulation.

We're here to help:
Easy ways to get the answers you need.

  • Chat Now
  • SEND EMAIL
  • Console installation
  • Probe installation
  • Accessories installation

Console installation

1. Look for convenient place on the wall in office, to install smart console.

2. Install the fixed plate of console tightly on the wall by expansion screw.

3. Hang console on the fixed plate reliably.

4. The PE of console should be connected to grounding reliably with more than 6 mm² multi-core copper soft cables.

5. Power supply AC220V.

Installation dimension drawing of console (Unit: mm)

 

Windbell tank gauge

Probe installation

Notice
1. For probe is high-precision product, please handle gently during move and installation.
2. During installation, please keep vertical of probe, otherwise will affect the accuracy of measurement.
3. Don't draw-off communication cable of probe when installation.
Process
1. Take probe out of package box.
2. Record "Manufacturing Code" on nameplate of probe, later communication setting will use it.
3. Remove foam package of probe.
4. Install fixed plate at both ends of electric house.
5. Plug communication cable into the socket at top of electric house and screw it tightly.
6. Carefully put oil floater and water floater at the bottom of probe.
7. Put probe into oil tank carefully by two hands, then hold fixed plate and adjust probe to be vertical, installation position please see Fig. 6.

Windbell tank gauge

Accessories installation

Safety warning
1. Every accessory must be installed in order and the order cannot be reversed.
2. Explosion-proof isolation sealed tube joint must be full filled with explosion proof daub, to prevent oil gas enters into control house through protection steel pipe.
3. Cables must be tightly compressed by sealing element, to prevent the infiltration of oil and gas.
4. All accessories must be screwed tightly.
5. The explosion proof junction box shall be grounded reliably, and the section area of the grounding wire shall be more than 6mm2.
6. When fasten the riser pipe flange and the bland flange, do not forget the sheet copper.
Windbell tank gauge

Related downloads

Fllow Us:

  • Youtube

  • Facebook

  • Twitter

  • Google+

  • Linkedin

CONTACT US

  • Tel:0371-6030 1609
  • Fax : +86-371-60301612
  • E-mail:sales@windbelltek.com

Add:No.9, Changchun Rd, High-tech Development Zone, Zhengzhou, China 450001

Our product

  • Automatic Tank Gauge Probes
  • Automatic Tank Gauge Consoles
  • Leak Detection System
  • Tank Monitoring Software
  • Tank Area Security Equipment
  • Tank Gauging Optional Device

GET IN TOUCH

 Solutions  |  Products  |  Support  |  News  |  About  |  Distributor  |  Contacts

Copyright © 2014-2015 ZHENGZHOU WINDBELL MEASUREMENT AND CONTROL TECHNOLOGY CO., LTD.All rights reserved. Powered by MetInfo 公司营业执照信息公示

- - Quick Links - -
PETROL PLAZA
PETROLEUM EQUIPMENT INSTITUTE
China Sinopec
CNPC
0371-6030 1609
8613783500071